TRACK RECORD
 
  
PROJECT RECORDS FOR ASIAN HERCULES (2003 – 2004
)

CLIENT DATE JOB DESCRIPTION
Keppel Shipyard Limited "FPSO Eagle" January 2003 Lifting of 1 unit of Swivel Stack (Wt. 60  MT) & 1 unit of Upper Gantry (Wt. 95 MT) from South Quay to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of 1 unit of PipeRack (No. 9 - Wt. 80 MT) & 1 unit of Travelling Crane (Wt. 80  MT) from Lot 2 to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of 1 unit of Flare Tower (Wt. 90  MT) from wharf at Benoi Yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of 1 unit of Module 12 (Wt. 290 MT) & 1 unit of Piperack (No. 10 - Wt. 80 MT) from East Yard/Lot 2 to install onto "FPSO Egale" at Keppel Tuas Yard
Single Buoy Moorings Inc. January 2003 Lifting of  1 unit of Module 11 (Wt. 335 MT) from DM Gul yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 9 (Wt. 212 MT) from DM Gul yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 10 (Wt. 284 MT) from BT Tuas yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 14 (Wt. 150 MT) from BT Tuas yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 19 (Wt. 200 MT) from DM Gul yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 23 (Wt. 200 MT) from DM Gul yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 1 (Wt. 520 MT) from "Happy Buccaner" to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 2  (Wt. 480 MT) from "Happy Buccaner" to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 6 (Wt. 332 MT) from DM Gul yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard

Lifting of  1 unit of Module 16 (Wt. 123 MT) from DM Gul yard and transport to install onto "FPSO Eagle" at Keppel Tuas Yard
Malaysia Shipyard and Engineering Sdn Bhd January 2003 Lifting of 1 unit of Mooring Structure (Wt. 643 MT), 1 Jacket (Wt. 550 MT) & 1 unit of Manifold Deck Module (Wt. 695 MT) from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor
Keppel Singmarine Dockyard Pte Ltd January 2003 Lifting of 3 units of Tugs (Wt. 418 MT & 650 MT each) from wharf onto water at Singmarine Benoi Yard
Malaysia Shipyard and Engineering Sdn Bhd March 2003 Lifting of 1 unit of Turret Head Structure (Wt. 1100 MT) & 1 unit of Swivel Access Structure (Wt. 280 MT) from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor
Keppel Shipyard Limited March 2003 Lifting of 1 unit of Tower Crane (Wt. 420 MT) from wharf from Raffles Pier to install at Tuas Dock
Jurong Shipyard (Pte) Ltd "Rig 184 & Rig 185" March 2003


May 2003




July 2003
Lifting of 1 unit of Living Quarter (Wt. 380 MT) from wharf for installation at Tg. Kling Quay

To lift & install 2 units of Truss Support Structure (Wt. 400 MT & 240 MT each) from Tg. Kling South Quay East to DD3

Lifting of 1 unit of Port Skidding Beam (Wt. 280 MT) from Tg. Kling C to Dry Dock 3

Lifting of 2 units of Truss Supports (Wt. 560 MT & 580 MT each) from DD3 onto shore at Tg. Kling Quay

Lifting of 1 unit HC2 Block (Wt. 750 MT) from wharf onto DD3 at Tg. Kling Quay
Jasib Shipyard and Engineering (M) Sdn Bhd April 2003 Lifting of 2 units of Old Hitachi CQC Cranes (Wt. 750 MT each) from wharf onto barge "Fels 18" at Port Klang, Malaysia Lifting of 2 units of Old Hitachi CQC Cranes (Wt. 750 MT each) from barge "Fels 18" onto wharf and to relocate 1 unit of Old Crane (Wt. 750 MT) at Kuantan Port, Malaysia
Fels Cranes Pte Ltd April 2003 Lifting of 1 unit of Quay Crane (Wt. 650 MT) from vessel "Happy Bucanner" onto wharf at Jurong Port
Jurong Shipyard (Pte) Ltd April 2003

May 2003
Lifting of 2 units of Main Engines (Wt. 450 MT each) for installation  at Tg. Kling Quay

Lifting of 1 Accommodation Block (Wt. 550 MT) from wharf at SML Yard and transport to offload onto wharf at Jurong Shipyard
Malaysia Shipyard and Engineering Sdn Bhd "North Lukut & Penera Drilling"

"Bunga Kertas"
June 2003




July 2003
Lifting of 1 unit of North Lukut Platform (Wt. 267 MT) & 1 unit of Penara Drilling Platform (Wt . 272 MT) from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor



Lifting of 1 unit of M2A (Wt. 427 MT), M2B (Wt. 184 MT), Flare Tower, Helideck (Wt. 180 MT), M4 (Wt. 279 MT), M5 (Wt. 463 MT), M3 (Wt. 86 MT), M6 (Wt. 41 MT), Flare KO & 1 M1 (Wt. 261 MT) from wharf for installation at MSE Pasir Gudang Yard, Johor
Smit Singapore Pte Ltd June 2003 Salvage Operation of "Tirta Mas’ at Off Tg. Piai, South West Malaysia
Smit Singapore Pte Ltd July 2003 Lifting of 1 unit of Accommodation Module (Wt. 800 MT) from Dockwise Vessel onto barge at Hong Hang Yard
Malaysia Shipyard and Engineering Sdn Bhd August 2003 Lifting of 1 unit of MOAB Substructure (Wt. 1400 MT) from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor
S M O E Pte Ltd "Dan FG Project" August 2003 To lift & install Level 1  (Wt. 964 MT) to the foundation, lift Level 3 Mezzanine (Wt. 580 MT) onto Level 3, Lift Level 2 (Wt. 790 MT) onto Level 1, Level 2 Mezzanine (Wt. 340 MT) onto Level 2 and complete level 3 & level 3 Mezzanine onto Level 2 at Sembawang Shipyard
Single Buoy Moorings Inc. "FPSO Marlim Sul" September 2003





October 2003


November 2003







December 2003
Lifting of 1 unit of Module 18 (Wt. 98 MT) from EPIM to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 15 (Wt. 145 MT) from EPIM to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 16 (Wt. 189 MT) from Dyna-Mac Gul Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Main Winch (Wt. 42 MT) onto Winch Deck at Keppel Tuas Yard

Lifting of 1 unit of Module 13 (Wt. 440 MT) from Dyna-Mac Gul Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 9 (Wt. 255 MT) from Dyna-Mac Gul yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 5 (Wt. 550 MT) from Dyna-Mac Gul Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 4 (Wt. 550 MT) from Dyna-Mac Gul Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 2 (Wt. 640 MT) from Dyna-Mac Gul Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 11 (Wt. 505 MT) from Dyna-Mac Gul Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 10 (Wt. 255 MT) from Dyna-Mac Gul Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 12 (Wt. 590 MT) from BT Tuas yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 1 (Wt. 743 MT) from Dyna-Mac Gul Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 14 (Wt. 235 MT) from BT Tuas Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard

Lifting of 1 unit of Module 3 (Wt. 480 MT) from BT Tuas Yard to transport and install onto "FPSO Marlim Sul" at Keppel Tuas Yard
Ramunia Fabricators Sdn Bhd September 2003 Lifting of 1 unit of Topside (Wt. 1200 MT) & 1 unit of Compressor Module (Wt. 700 MT) from wharf for loadout onto barge at Teluk Ramunia Yard, Johor
Sembawang Shipyard Pte Ltd September 2003 To lift & install 1 unit of Mast Crane (Wt. 800 MT) from vessel onto "Jascon-5" at Sembawang Shipyard
S M O E Pte Ltd September 2003 Lifting of 6 units of Pancake Panels (Cellar Deck East, Separation Panel, Cellar Deck West, Water Injection Panel, Weather Deck East, Lifting Frame East, Drop Object Panel, Weather Deck West, Power Generation Panel) at Sembawang Shipyard
Mecomb Engineering Sdn Bhd September 2003 Lifting of 1 unit of Topside KTMP (Wt. 720 MT), 1 Helideck (Wt. 125 MT), 1 Substructure KTMP Jacket Top (Wt. 676 MT), 1 Substructure KTMP Bottom (Wt. 505 MT) & 1 Substructure Jacket (KTV-A Wt. 422 MT) from barge onto wharf at SSE Teluk Ramuni yard, Johor
Keppel Shipyard Limited "FPSO Falcon" September 2003 To lift & overturn 1 unit of Lower Bearing Support (Wt. 600  MT) onto "FPSO Falcon" at Keppel Tuas Yard

To lift 1 unit of Moonpool (Wt. 280 MT)  onto "FPSO Falcon" at Keppel Tuas Yard

To lift 1 unit of  Middle & Lower Turret Structure (Wt. 550 MT)  onto "FPSO Falcon" at Keppel Tuas Yard

To lift 1 unit of Upper Bearing Structure (Wt. 238 MT)  onto "FPSO Falcon" at Keppel Tuas Yard

To lift 1 unit of  Upper Turret Structure (Wt. 513 MT)  onto "FPSO Falcon" at Keppel Tuas Yard

To lift 1 unit of Superstructure (Wt. 373 MT)  onto "FPSO Falcon" at Keppel Tuas Yard

To lift 1 unit of Overhead Structure (Wt. 390 MT)  onto "FPSO Falcon" at Keppel Tuas Yard

To lift 1 unit of Flare Tower (Wt. 220 MT)  onto "FPSO Falcon" at Keppel Tuas Yard
PT McDermott Indonesia October 2003 Lifting of 1 unit of Power Control Building (Mod. C8 - Wt. 454 MT) 1 unit of Workshop (Mod. C9 - Wt. 769 MT) from wharf/barge for installation onto "FPSO Belanak" at PT McDermott Batam Yard, Indonesia
Hapag-Lloyd (Singapore) Pte Ltd November 2003 Lifting of 1 unit of Turbine (Wt. 203 MT) & 1 unit of Generator (Wt. 235 MT) from vessel "Pond Vespucci" onto barge at Tanjong Pagar Terminal
Dyna-Mac Engineering Services Pte Ltd November 2003 Lifting of 1 unit of Vent Tower (Wt. 159 MT) from wharf at Dyna-Mac Gul Yard and transport to offload onto vessel "Talabot" at Tanjong Pagar Terminal (BY LIFT & GO)
Keppel Singmarine Dockyard Pte Ltd November 2003 Lifting of 3 units of Tugs (Wt. 400 MT each) from wharf onto water at Keppel Singmarine Benoi Yard
Malaysia Shipyard and Engineering Sdn Bhd "Mad Dog Platform Drilling Rig" December 2003 Lifting of 2 units of Pipe Deck Level from wharf for loadout onto barge at MSE Pasir Gudang yard, Johor Lifting of 1 unit of Skid Box (Wt. 342 MT) from wharf onto drilling support module at MSE Pasir Gudang Yard, Johor
Pan-United Shipyard (Pte) Ltd April 2004 Lifting of 1 unit of Roro Block (Wt. 900 MT) from wharf onto Floating Dock No. 3 at Pan United Shipyard
Jurong Shipyard Pte Ltd "FPSO Nina" April 2004


May 2004


June 2004


July 2004






August 2004
Lifting of 1 unit of E-House (Mod. 11 - Wt. 413 MT) from wharf at EPIM yard and transport to install onto "FPSO Nina" at Jurong Shipyard

Lifting of 1 unit of Module 21 (Wt. 335 MT) & Module 8 (Wt. 240 MT) from barge to install onto "FPSO Nina" at Jurong Shipyard

Lifting of 1 unit of Module 5 (Wt. 653 MT) & Module 6 (Wt. 610 MT) from barge to install onto "FPSO Nina" at Jurong Shipyard

Lifting of 1 unit of Module 1 (Wt. 460 MT) & Module 2 (Wt. 225 MT), Module 3 (Wt. 201 MT), Module 4 (Wt. 507 MT) & Module 9 (Wt. 805 MT) from barge to install onto "FPSO Nina" at Jurong Shipyard

Lifting of 1 unit of Turret Support Structure (Wt. 500 MT) from barge to install onto "FPSO Nina" at Jurong Shipyard

Lifting of 1 unit of  Turret Head (Wt. 900 MT) from barge to install onto "FPSO Nina" at Jurong Shipyard
Smit Singapore Pte Ltd January to
April 2004
Salvage Operation to "Tasman Spirit" in Karachi, Pakistan
Jurong S hipyard (Pte) Ltd April 2004 Lifting of 2 units of Main Engines (Wt. 480 MT & 350 MT each) & 1 unit of Accommodation Block (Wt. 550 MT) for installation onto Dry Dock 5, Tg. Kling Quay
Titan Project Services Pte Ltd April 2004 Lifting of 1 unit Passenger Boat (Wt. 350 MT) from wharf onto water at Tuas Yard
ECL (Singapore) Pte Ltd May 2004 Lifting of 1 unit of Turbine (Wt. 371 MT), 1 unit of Statos (Wt. 318 MT) & 3 units of Cargoes (Max. Wt. 86 MT each) from vessel "Ocean Auspices" onto barge at Jurong Port
Goldin Enterprise Pte Ltd May 2004 Lifting of 5 units of Generators (Wt. 97 MT each) from vessel "Shanghai Express" onto barge at Tanjong Pagar Terminal
Hapag-Lloyd (Singapore) Pte Ltd May 2004 Lifting of 1 unit of Gas Turbine (Wt 306 MT) from vessel "NYK Phoenix" onto barge at Tanjong Pagar Terminal
S M O E Pte Ltd June 2004 To lift & install 4 units of Offshore slings for Dan FG Project at Sembawang S hipyard
Titan Project Services Pte Ltd June 2004 Lifting of 1 unit of Boat (Wt. 400 MT) from wharf onto water at Tuas Yard
Daiho Project Services Pte Ltd July 2004 Lifting of 3 units of Reactors (Wt. 425 MT each) from vessel onto barge at Jurong Port Lifting of 3 units of Reactors (Wt. 425 MT each) from barge onto wharf at Sakra Basin
Keppel Shipyard (Pte) Ltd July 2004 To remove 2 units of Gantry Cranes (Wt. 312 MT each) from vessel "LTC Calvin Titus" onto wharf at Keppel Tuas Yard
Titan Project Services Pte Ltd July 2004 Lifting of 2 units of Boats (Wt. 350 MT each) from water onto vessel "Annemeike" at Pasir Panjang Wharf
Ramunia Fabricators Sdn Bhd August 2004 Lifting of 1 unit of Guntong F Topside (Wt. 600 MT) from wharf for loadout onto barge at Teluk Ramunia Fabricators Yard, Johor Lifting of 1 unit of Irong Barat C Topside (Wt. 600 MT) from wharf for loadout onto barge at Teluk Ramunia Fabricators Yard, Johor
Jurong Shipyard (Pte) Ltd August 2004 Lifting of 2 units of Upper Support Truss (Wt. 300 MT each) from barge at TK North to TK East onto Top structure, Jurong Shipyard
Sime SembCorp Engineering Sdn Bhd August 2004 Lifting of 1 unit of Irong Barat-C Jacket (Wt. 670 MT) from wharf for loadout onto barge at SSE, Pasir Gudang Yard, Johor

Lifting of 1 unit of Guntong-F Jacket (Wt. 645 MT) from wharf for loadout onto barge at SSE, Pasir Gudang Yard, Johor
Malaysia Shipyard and Engineering Sdn Bhd August 2004 Lifting of 1 unit of Turret (Wt. 1210 MT) & 1 Swivel Access Structure (Wt. 180 MT) from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor
ASL Shipyard Pte Ltd August 2004 To lift & upright 4 units of Ship Hull Blocks (Wt. 270 MT each) at Ang Sin Liu Shipyard
Pan-United Shipyard Pte Ltd August 2004 Lifting of 1 unit of Block (Wt. 450  MT) from water onto floating dock and 1 unit of Accommodation Module (Wt. 150 MT0 from wharf onto floating dock at Pan United Tuas Yard
Ramunia Fabricators Sdn Bhd August 2004 Lifting of 1 unit of Guntong F Topside (Wt. 600 MT) from wharf for loadout onto barge at Teluk Ramunia Fabricators Yard, Johor

Lifting of 1 unit of Irong Barat C Topside (Wt. 600 MT) from wharf for loadout onto barge at Teluk Ramunia Fabricators Yard, Johor
Sime SembCorp Engineering Sdn Bhd September 2004 Lifting of 1 unit of Rigging Platform (Wt. 180 MT) from wharf onto Topside at SSE Pasir Gudang Yard, Johor
Ta-Ching Marine Technology Pte Ltd September 2004 Lifting of 1 Water Injection Pump Module (Wt. 273 MT) & 1 unit of Water Injection Treatment Module (Wt. 555 MT) for transport to offload onto "MT Airway" at Jurong Shipyard
Dyna-Mac Engineering Services Pte Ltd September 2004 Lifting of 2 units of Modules A & B (Wt. 550 MT each) from wharf onto vessel "MT Airway"a t Jurong Shipyard
Sime SembCorp Engineering Sdn Bhd October 2004 Lifting of 1 unit of Compression Module (AMP1 - WT. 700 MT) from wharf for loadout onto transportation barge at SSE Pasir Gudang Yard, Johor
Labroy Shipbuilding and Engineering Pte Ltd October 2004 Lifting of 2 units of Tugs (Wt. 450 MT each) from wharf onto water at Labroy Batam Yard, Indonesia
S M O E Pte Ltd October 2004 Lifting of 2 units of Bridges (Wt. 165 MT & 414 MT each) from wharf for loadout onto barge at Kabil Yard, Batam, Indonesia
Keppel Singmarine Dockyard Pte Ltd November 2004 Lifting of 2 units of Tugs (Hull 273 & 274 - Wt. 385 MT each) from wharf onto water at Keppel Benoi Basin yard
Zelan Murray & Roberts JV November to December 2004 Lifting of 42 untis of Precast Culvert Elements (Wt. 450 MT each) from wharf at PTP and transport to place into position at Tanjung Bin, Johor