TRACK RECORD
 
  
PROJECT RECORDS FOR ASIAN HERCULES II (2003 - 2004)

CLIENT DATE JOB DESCRIPTION
Sime SembCorp Engineering Sdn Bhd “Yoho Project” October 2003 Lifting of 4 units of Boat Landings (Wt. 93 –1 04 MT each), 14 units of Piles (Wt. 58 – 83 MT each), 1 YB Jacket (Wt. 794 MT), 1 ZBA Jacket (Wt. 1078 MT) from wharf for loadout onto barge at SSE Teluk Ramunia Yard, Johor, Malaysia
PT McDermott Indonesia “Conoco Belanak Project” November 2003 & January/ February 2004 Lifting of Modules P7, S7, S6, P5, S5, C3, Aft Crane Pedestal, S4, S2, S1, C2, C1, P4, P3, P2, P1, Crane Pedestal and Flare Boom from wharf  for installation onto “FPSO Belanak” at McDermott Batam Yard, Indonesia
Nippon Steel Batam “Bass Gas Project” (Fitted with JIB II) November 2003 Lifting of 1 unit of Deck (Wt. 3000 MT) to stack on base structure and to lift and upend 1 unit of Jacket (Wt. 1400 MT) and to stack Jacket onto Base Structure at Nippon Steel Batam, Indonesia
Jurong Shipyard (Pte) Ltd “Rig 184/Rig 185” November 2003


March/May 2004
Lifting of 1 unit of Drill Floor (Wt. 1100 MT) at Tg. Kling Quay Lifting of 1 unit of Living Quarter

Lifting of 1 unit of Skid Beam (Wt. 265 MT)
Malaysia Shipyard Engineering Sdn Bhd “Mad Dog Project” December 2003 Lifting of 1 unit of Mad Dog Drilling Module (Wt. 2304 MT) from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor, Malaysia
Esprit Korea Co., Ltd January 2004

January 2004
Lifting of 1 unit of unloader (Wt. 1280 MT) at Amoy, China

Lifting of 3 units of Old Cranes (Wt. 1000 MT each) & 2 units of New Unloaders (Wt. 1360 MT each) in Hong Kong
Labroy Shipbuilding and Engineering Pte Ltd January 2004 Lifting of 1 unit of Accommodation Module (Max. Wt. 1100 MT) from wharf for loadout onto barge at PT Nanindah Mutiara Yard, Batam, Indonesia
S M O E Pte Ltd “Oxy Project” March 2004 Lifting of 4 units of Pancakes (P, Q, P & P) for stacking at Sembawang Shipyard, Singapore
S M O E Pte Ltd “Dan FG Jacket” April 2004 Lifting of 1 unit of Jacket (Wt. 3200  MT inc. Riggings) from wharf for loadout onto barge at PT Mc. Dermott Batam Yard, Batam, Indonesia
Jurong Shipyard Pte Ltd April – May 2004 Lifting of 2 units of Main Engines (Wt. 480 MT & 350 MT each), 1 Accommodation Block (Wt. 550 MT)  for installation onto Dry Dock 5 at Tg. Kling Quay
Pan United Shipyard Pte Ltd Jan – June 2004 Lifting of 4 units of Quay Cranes (Wt. 1100 MT each) per operation from wharf at Pan United Batam Yard and transport to offload onto wharf at Jurong Port, Singapore (BY LIFT & GO METHOD)
Global Santa Fe Corporation “Development Driller and Development Driller II” (Fitted with JIB II) June 2004 To remove 1 unit of Water Table (Wt. 75 MT) from Development Driller (1st Ops) and re-install back the same unit onto “Development Driller II” (2nd Ops) at Tg. Kling Quay, Singapore
Malaysia Shipyard and Engineering Sdn Bhd “Kizomba B Project” March – July 2004 Lifting of 1 unit of Des Skid Base (Wt. 800 MT) for erection, 1 unit of Derrick Structure (Wt. 300 MT) for erection, 1 unit of DES/Skid Base (Wt.1834 MT) & 1 unit of DSM (Wt.2 504 MT) from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor, Malaysia
Jurong Shipyard Pte Ltd “P50” July 2004 Lifting of Flare Boom (P50 – Wt. 300 MT) from wharf at PPL Pandan Yard and transport to offload onto wharf at Tg. Kling Quay, Jurong (BY LIFT & GO METHOD)

Lifting of 1 unit of Upper Support Truss (Wt. 500 MT) from barge onto Dockhead at Tg. Kling Quay, Singapore
Jurong Shipyard Pte Ltd “FPSO Nina” May- August 2004 Lifting of 6 Centre Piperacks (Mod. 22, 23, 24, 25, 26 & 27 Wt. 258 MT each), 1 Module 21 (Wt. 335 MT), 1 unit of Module. 13 (Wt. 240 MT), 3 units of Modules (1, 2 & 3 Wt. 201 – 460 MT each), 1 unit of Turret (Wt. 900 MT) & 1 unit of SAS (Wt. 180 MT) from barge onto “FPSO Nina” at Tg. Kling Quay, Singapore
Smit Singapore Pte Ltd “Atwood Beacon” August – September 2004 Salvage Operations for recovery of Leg Sections for Rig “A Beacon” at Natuna Sea, Indonesia
S M O E Pte Ltd “Erha Project” September – October 2004


November  2004
Lifting of Mod S1, Mod S (Wt. 505 MT), Mod. A Control Room (Wt. 336 MT), Mod. B (Wt. 2010 MT), Mod D1 (Wt. 1013 MT), Mod. D2 (Wt. 1213 MT) & Emergency Diesel Generator (Wt. 80 MT) from wharf onto “FPSO Erha” at Sembawang Shipyard, Singapore

Lifting of 1 Flare (R2 WT. 63 MT), KO Drum (R3 Wt. 271 MT), Mod. T (Wt. 693 MT), Mod. U (Wt. 819 MT), Mod. V (Wt. 577 MT), Mod. C (Wt. 193 MT), Mod. G (Wt. 1187 MT), Mod. F (Wt. 1298 MT), Mod. H (Wt. 147 MT), Mod. N1 (Wt. 1863 MT), Mod. N2 (Wt. 859 MT), Mod. P (Wt. 1823 MT), Mod. M (Wt. 1707 MT), Mod. E (Wt. 1923 MT), Mod. L1 (Wt. 1788 MT), Mod. L2 (Wt. 720 MT0, Mod. Q (Wt. 1935 MT), Mod. K1 (Wt. 2453 MT) & Mod. K2 (Wt. 1629 MT0 from wharf onto “FPSO Erha” at Sembawang Shipyard, Singapore
S M OE Pte Ltd “Oxy Project” November 2004 Lifting of Power Gen. Module, Lifting Filter, Lifting Frame, Compression Module and to install shackles, lifting of Separation Module, Water Injection at Sembawang Shipyard, Singapore
Nippon Steel Batam “Well Platform Project” December 2004 Lifting of 1 unit of ZB Jacket (Wt. 1800 MT) from wharf for loadout onto barge at Nippon Steel Batam yard, Indonesia

ASIAN LIFT PROJECT RECORDS FOR CONTAINER QUAY CRANE LIFTS 1997 - 2004
CLIENT DATE JOB DESCRIPTION
Kamigumi Singapore March 1997 Lifting of 2 x CQC cranes from barge to shore at Pasir Panjang Container Port
Kamigumi Singapore June 1997 Lifting of 2 x CQC cranes from barge to shore at Pasir Panjang Container Port
PT Batamas Jala Nusantara August 1997 Lifting of 2 units of Quayside crane in sections at Tg. Unchang Yard, Batam from transportation barge to installation location
Sankyu (S) Pte Ltd December 1997 Lifting of 2 units of Rail Mounted Gantry Crane from Promet Singapore yard and transport in hook to Pasir Panjang Container Wharf
NKK Corporation December 1997 Lifting of 1 unit of Gantry crane at Promet yard, Singapore
Jasib Shipyard Engineering Sdn Bhd December 1997 Lifting of 2 x CQC Girder at KPM Port Klang, Malaysia
Kamigumi Singapore February 1998 Lifting of 2 CQC from vessel onto wharf at Pasir Panjang Container Port
Kamigumi Singapore April 1998 Lifting of 2 CQC from vessel “Zhen Hua 2” onto wharf at Pasir Panjang Container Port
Kamigumi Singapore May 1998 Lifitng of 2 CQC from vessel “Zhen Hua 2” onto wharf at Pasir Panjang Container Port
Kamigumi Singapore September 1998 To lift 3 CQC from vessel “Zhen Hua 3” onto wharf at PPCP
Kamigumi Singapore November 1998 To lift 3 CQC from vessel “Zhen Hua 3” onto wharf at Pasir Panjang Container Port
Jasib Shipyard Engineering Sdn Bhd August 1999 To lift and install 2 CQC girder onto leg at Port of Tanjung Pelepas, Johor, Malaysia
Esprit Korea Co., Ltd January 2004 January 2004 Lifting of 1 unit of unloader (Wt. 1280 MT) at Amoy, China Lifting of 3 units of Old Cranes (Wt. 1000 MT each) & 2 units of New Unloaders (Wt. 1360 MT each) in Hong Kong
Pan United Shipyard Pte Ltd Jan – June 2004 Lifting of 4 units of Quay Cranes (Wt. 1100 MT each) per operation from wharf at Pan United Batam Yard and transport to offload onto wharf at Jurong Port, Singapore (BY LIFT & GO METHOD)