| CLIENT |
DATE |
JOB DESCRIPTION |
| Sime SembCorp Engineering Sdn Bhd “Yoho Project” |
October 2003 |
Lifting of 4 units of Boat Landings (Wt. 93 –1 04 MT
each), 14 units of Piles (Wt. 58 – 83 MT each), 1 YB Jacket (Wt. 794
MT), 1 ZBA Jacket (Wt. 1078 MT) from wharf for loadout onto barge
at SSE Teluk Ramunia Yard, Johor, Malaysia |
| PT McDermott Indonesia “Conoco Belanak Project” |
November 2003 & January/ February
2004 |
Lifting of Modules P7, S7, S6, P5, S5, C3, Aft Crane
Pedestal, S4, S2, S1, C2, C1, P4, P3, P2, P1, Crane Pedestal and Flare
Boom from wharf for installation onto “FPSO Belanak” at McDermott
Batam Yard, Indonesia |
| Nippon Steel Batam “Bass Gas Project” (Fitted with JIB
II) |
November 2003 |
Lifting of 1 unit of Deck (Wt. 3000 MT) to stack on
base structure and to lift and upend 1 unit of Jacket (Wt. 1400 MT)
and to stack Jacket onto Base Structure at Nippon Steel Batam, Indonesia |
| Jurong Shipyard (Pte) Ltd “Rig 184/Rig 185” |
November 2003
March/May 2004 |
Lifting of 1 unit of Drill Floor (Wt. 1100 MT) at Tg.
Kling Quay Lifting of 1 unit of Living Quarter
Lifting of 1 unit of Skid Beam (Wt. 265 MT)
|
| Malaysia Shipyard Engineering Sdn Bhd “Mad Dog Project” |
December 2003 |
Lifting of 1 unit of Mad Dog Drilling Module (Wt. 2304
MT) from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor,
Malaysia |
| Esprit Korea Co., Ltd |
January 2004
January 2004 |
Lifting of 1 unit of unloader (Wt. 1280 MT) at Amoy,
China
Lifting of 3 units of Old Cranes (Wt. 1000 MT each) & 2 units
of New Unloaders (Wt. 1360 MT each) in Hong Kong |
| Labroy Shipbuilding and Engineering Pte Ltd |
January 2004 |
Lifting of 1 unit of Accommodation Module (Max. Wt.
1100 MT) from wharf for loadout onto barge at PT Nanindah Mutiara
Yard, Batam, Indonesia |
| S M O E Pte Ltd “Oxy Project” |
March 2004 |
Lifting of 4 units of Pancakes (P, Q, P & P) for
stacking at Sembawang Shipyard, Singapore |
| S M O E Pte Ltd “Dan FG Jacket” |
April 2004 |
Lifting of 1 unit of Jacket (Wt. 3200 MT inc. Riggings)
from wharf for loadout onto barge at PT Mc. Dermott Batam Yard, Batam,
Indonesia |
| Jurong Shipyard Pte Ltd |
April – May 2004 |
Lifting of 2 units of Main Engines (Wt. 480 MT &
350 MT each), 1 Accommodation Block (Wt. 550 MT) for installation
onto Dry Dock 5 at Tg. Kling Quay |
| Pan United Shipyard Pte Ltd |
Jan – June 2004 |
Lifting of 4 units of Quay Cranes (Wt. 1100 MT each)
per operation from wharf at Pan United Batam Yard and transport to
offload onto wharf at Jurong Port, Singapore (BY LIFT & GO METHOD) |
| Global Santa Fe Corporation “Development Driller and
Development Driller II” (Fitted with JIB II) |
June 2004 |
To remove 1 unit of Water Table (Wt. 75 MT) from Development
Driller (1st Ops) and re-install back the same unit onto
“Development Driller II” (2nd Ops) at Tg. Kling Quay, Singapore |
| Malaysia Shipyard and Engineering Sdn Bhd “Kizomba B
Project” |
March – July 2004 |
Lifting of 1 unit of Des Skid Base (Wt. 800 MT) for
erection, 1 unit of Derrick Structure (Wt. 300 MT) for erection, 1
unit of DES/Skid Base (Wt.1834 MT) & 1 unit of DSM (Wt.2 504 MT)
from wharf for loadout onto barge at MSE Pasir Gudang Yard, Johor,
Malaysia |
| Jurong Shipyard Pte Ltd “P50” |
July 2004 |
Lifting of Flare Boom (P50 – Wt. 300 MT) from wharf
at PPL Pandan Yard and transport to offload onto wharf at Tg. Kling
Quay, Jurong (BY LIFT & GO METHOD)
Lifting of 1 unit of Upper Support Truss (Wt. 500 MT) from barge onto
Dockhead at Tg. Kling Quay, Singapore |
| Jurong Shipyard Pte Ltd “FPSO Nina” |
May- August 2004 |
Lifting of 6 Centre Piperacks (Mod. 22, 23, 24, 25,
26 & 27 Wt. 258 MT each), 1 Module 21 (Wt. 335 MT), 1 unit of
Module. 13 (Wt. 240 MT), 3 units of Modules (1, 2 & 3 Wt. 201
– 460 MT each), 1 unit of Turret (Wt. 900 MT) & 1 unit of SAS
(Wt. 180 MT) from barge onto “FPSO Nina” at Tg. Kling Quay, Singapore |
| Smit Singapore Pte Ltd “Atwood Beacon” |
August – September 2004 |
Salvage Operations for recovery of Leg Sections for
Rig “A Beacon” at Natuna Sea, Indonesia |
| S M O E Pte Ltd “Erha Project” |
September – October 2004
November 2004 |
Lifting of Mod S1, Mod S (Wt. 505 MT), Mod. A Control
Room (Wt. 336 MT), Mod. B (Wt. 2010 MT), Mod D1 (Wt. 1013 MT), Mod.
D2 (Wt. 1213 MT) & Emergency Diesel Generator (Wt. 80 MT) from
wharf onto “FPSO Erha” at Sembawang Shipyard, Singapore
Lifting of 1 Flare (R2 WT. 63 MT), KO Drum (R3 Wt. 271 MT), Mod. T
(Wt. 693 MT), Mod. U (Wt. 819 MT), Mod. V (Wt. 577 MT), Mod. C (Wt.
193 MT), Mod. G (Wt. 1187 MT), Mod. F (Wt. 1298 MT), Mod. H (Wt. 147
MT), Mod. N1 (Wt. 1863 MT), Mod. N2 (Wt. 859 MT), Mod. P (Wt. 1823
MT), Mod. M (Wt. 1707 MT), Mod. E (Wt. 1923 MT), Mod. L1 (Wt. 1788
MT), Mod. L2 (Wt. 720 MT0, Mod. Q (Wt. 1935 MT), Mod. K1 (Wt. 2453
MT) & Mod. K2 (Wt. 1629 MT0 from wharf onto “FPSO Erha” at Sembawang
Shipyard, Singapore |
| S M OE Pte Ltd “Oxy Project” |
November 2004 |
Lifting of Power Gen. Module, Lifting Filter, Lifting
Frame, Compression Module and to install shackles, lifting of Separation
Module, Water Injection at Sembawang Shipyard, Singapore |
| Nippon Steel Batam “Well Platform Project” |
December 2004 |
Lifting of 1 unit of ZB Jacket (Wt. 1800 MT) from wharf
for loadout onto barge at Nippon Steel Batam yard, Indonesia |
| CLIENT |
DATE |
JOB DESCRIPTION |
Kamigumi Singapore |
March 1997 |
Lifting of 2 x CQC cranes from barge to shore
at Pasir Panjang Container Port |
| Kamigumi Singapore |
June 1997 |
Lifting of 2 x CQC cranes from barge to shore
at Pasir Panjang Container Port |
| PT Batamas Jala Nusantara |
August 1997 |
Lifting of 2 units of Quayside crane in sections
at Tg. Unchang Yard, Batam from transportation barge to installation
location |
| Sankyu (S) Pte Ltd |
December 1997 |
Lifting of 2 units of Rail Mounted Gantry
Crane from Promet Singapore yard and transport in hook to Pasir Panjang
Container Wharf |
| NKK Corporation |
December 1997 |
Lifting of 1 unit of Gantry crane at Promet
yard, Singapore |
| Jasib Shipyard Engineering Sdn Bhd |
December 1997 |
Lifting of 2 x CQC Girder at KPM Port Klang,
Malaysia |
| Kamigumi Singapore |
February 1998 |
Lifting of 2 CQC from vessel onto wharf at
Pasir Panjang Container Port |
| Kamigumi Singapore |
April 1998 |
Lifting of 2 CQC from vessel “Zhen Hua 2”
onto wharf at Pasir Panjang Container Port |
| Kamigumi Singapore |
May 1998 |
Lifitng of 2 CQC from vessel “Zhen Hua 2”
onto wharf at Pasir Panjang Container Port |
| Kamigumi Singapore |
September 1998 |
To lift 3 CQC from vessel “Zhen Hua 3” onto
wharf at PPCP |
| Kamigumi Singapore |
November 1998 |
To lift 3 CQC from vessel “Zhen Hua 3” onto
wharf at Pasir Panjang Container Port |
| Jasib Shipyard Engineering Sdn Bhd |
August 1999 |
To lift and install 2 CQC girder onto leg
at Port of Tanjung Pelepas, Johor, Malaysia |
| Esprit Korea Co., Ltd |
January 2004 January 2004 |
Lifting of 1 unit of unloader (Wt. 1280 MT)
at Amoy, China Lifting of 3 units of Old Cranes (Wt. 1000 MT each)
& 2 units of New Unloaders (Wt. 1360 MT each) in Hong Kong |
| Pan United Shipyard Pte Ltd |
Jan – June 2004 |
Lifting of 4 units of Quay Cranes (Wt. 1100
MT each) per operation from wharf at Pan United Batam Yard and transport
to offload onto wharf at Jurong Port, Singapore (BY LIFT & GO
METHOD) |